Since the Gotthard Highway Tunnel, which opened in 1981, needs to be renovated, they have the luxury of building a second tube during the renovation. After the renovation, both tubes will offer more safety by separating traffic directions, but will only be allowed to have one lane per tube. It will be interesting to see whether this will be adhered to... The excavated material will be transported to Flüelen by train. The Railpool 186 497 has arrived in Airolo with its block freight train consisting of Sggrrs S 204 double wagons. The wagons are then maneuvered under the loading device (left in the picture) and loaded. January 21, 2025 Stefan Wohlfahrt
With 90 minutes delay thanks to another technical hitch-up on Germany's railways, Dispo-Tf 193 168 hauls a rakem of box wagons through Wijchen on 2 February 2025. Leonardus Schrijvers
The Railpool 186 497 has arrived in Airolo with its block freight train consisting of Sggrrs S 204 double wagons. The wagons are then maneuvered under the loading device (left in the picture) and loaded.
January 21, 2025 Stefan Wohlfahrt
Due to a defect on one wagon, KRE 193 144 has to do some very time-consuming shunting works at Emmerich om the afternoon of 23 October 2023 when finally the Suns shows herself. Leonardus Schrijvers
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren.
Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.