Two SBB GIRUNO RABe 501s are in Faido on their way south. At first glance, Faido train station appears as it did before the GTB went into operation, but upon closer inspection (and it is hardly visible in the photo) tracks 1 and 4 are no longer in use, the switches are screwed and the contact line is grounded.
Sept. 4, 2023
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 30.09.2023, 374 Views, 0 Comments
EXIF: SONY ILCA-77M2, Date 2023:09:04 12:03:38, Exposure time: 1/640, Aperture: 80/10, ISO125, Focal length: 220/10
188 1200x767 Px, 14.09.2025
210 1200x801 Px, 01.09.2025
181 1200x799 Px, 01.09.2025
219 1200x713 Px, 21.08.2025