Two SBB GIRUNO RABe 501s are in Faido on their way south. At first glance, Faido train station appears as it did before the GTB went into operation, but upon closer inspection (and it is hardly visible in the photo) tracks 1 and 4 are no longer in use, the switches are screwed and the contact line is grounded.
Sept. 4, 2023
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 30.09.2023, 103 Calls, 0 Comments
EXIF: SONY ILCA-77M2, Date 2023:09:04 12:03:38, Exposure time: 1/640, Blend: 80/10, ISO125, Focal length: 220/10
47 1200x1022 Px, 23.01.2025
46 1200x762 Px, 23.01.2025
34 1200x853 Px, 22.01.2025
82 1200x806 Px, 03.03.2024