Two SBB GIRUNO RABe 501s are in Faido on their way south. At first glance, Faido train station appears as it did before the GTB went into operation, but upon closer inspection (and it is hardly visible in the photo) tracks 1 and 4 are no longer in use, the switches are screwed and the contact line is grounded.
Sept. 4, 2023
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 30.09.2023, 73 Calls, 0 Comments
EXIF: SONY ILCA-77M2, Date 2023:09:04 12:03:38, Exposure time: 1/640, Blend: 80/10, ISO125, Focal length: 220/10
54 1200x806 Px, 03.03.2024
77 806x1200 Px, 26.01.2024
83 1200x806 Px, 26.01.2024
79 1200x838 Px, 26.01.2024